
Medis Pharma
2024
Enjoy total freedom, apart from the grid
Power cuts are a risk when storing medical supplies and can lead to significant financial losses.
| Client | Medis Pharma |
|---|---|
| Goal | Install an uninterrupted power supply that has adequate capacity for cloudy days and power up the electric fleet. |
| Location | Santiago – Praia |
| Load Details | Warehouse with multiple temperature zones and offices. |
| GTEKs participation | The design and implementation of an adequate off-grid solar energy system with sufficient storage. |
Renewble Details
| PV-AC | 25 kW |
| PV-DC | 30 kW |
| Storage | 31 kWh |
| Bat-Inv | 24 kW |



