GTeck project - Matos - Warehouse

Medis Pharma

2024

Enjoy total freedom, apart from the grid

Power cuts are a risk when storing medical supplies and can lead to significant financial losses.

ClientMedis Pharma
GoalInstall an uninterrupted power supply that has adequate capacity for cloudy days and power up the electric fleet.
LocationSantiago – Praia
Load DetailsWarehouse with multiple temperature zones and offices.
GTEKs participationThe design and implementation of an adequate off-grid solar energy system with sufficient storage.

Renewble Details

PV-AC25 kW
PV-DC30 kW
Storage31 kWh
Bat-Inv24 kW

Scroll to Top