
SWRO Furna
2024
Drinking water powered by Solar Energy
Water is not only scarce in Brava. The high fluoride content in the natural water sources also has an impact on health.
| Client | Aguabrava |
|---|---|
| Partner | LuxDev |
| Goal | Supplying the population with uncontaminated water. |
| Location | Brava – Furna |
| Load Details | 1200 m³ drinking water per day |
| GTEKs participation | The project involved the installation of two ground-mounted photovoltaic generators at the desalination plant and a pumping station. |
Renewble Details
| PV-AC | 400 kW |
| PV-DC | 475 kW |





