
CIMPOR
2024
Big power for big machines
A quarry requires an enormous amount of energy.
| Client | CIMPOR |
|---|---|
| Goal | Cut energy costs and reduce carbon footprint. |
| Location | Santiago – Praia |
| Load Details | Installation of ground-mounted photovoltaic generator |
| GTEKs participation | Redesign and installation of an existing System |
Renewble Details
| PV-AC | 220 kW |
| PV-DC | 265 kW |





